The wetlands, located south-west of the intersection of Cheltenham Parade and Torrens Road, St Clair (formerly Cheltenham), were constructed as part of Waterproofing the West stage 1 as well as servicing a development of some 1200 homes on the site.
The wetland works include: Construction of three main wetland areas, three minor wetlands and two inlet ponds, stormwater drainage, ASR borefield infrastructure and de-watering systems.